Proposals for reordering the church were put to the parish in July 2017 and a steering group was formed to carry the process forward. 

 

The steering group has met nearly 20 times, and its members have put in many hours of work outside of these meetings. As a group, we have been through all the suggestions that have been put forward and considered their merits.  We have met builders, contractors, and visited other churches that have had similar work done.  This has been a slow process, but we have not felt it beneficial to rush.  

We are now in a position to put specific proposals to the parish.  

 

The group consists of:

  • Alex Wells

  • Leo White

  • Michael Luckie

  • Teresa Soan

Leo and Alex were involved in the 1996 reordering.

From June 2-23rd 2019 there was a 4 week consultation period with a large display in the porch.

The consultation paper that was published in the parish newsletter can be read here 

The architectural plan of the proposed sanctuary wall can be viewed here  

and the architectural floor plan for the proposals can be viewed here 

Feedback from the June consultation is expected over the summer.

 

You can read the March 2018 interim report here

 

 

The initial proposal presented by Fr Dylan to the parish can be viewed here though these have already been adjusted in response to feedback

 

 

© 2023 by Skyline